Elysia BESS Copilot – managing more mine GWh with less effort

Battery energy storage system (BESS) portfolios at mines are arguably growing faster than the teams and operating models that run them. This gap Elysia says leads to chronic asset underperformance, revenue loss and operational complexity that compounds with every megawatt-hour added. 

Elysia is Fortescue Zero’s battery intelligence division – and it has just launched Elysia BESS Copilot, a suite of performance engineering solutions purpose-built to supercharge BESS asset management teams, so they can improve the performance of every asset at scale. 

Elysia BESS Copilot is the first technical management solution to translate battery analytics directly into action. While existing solutions retroactively surface underperformance issues and signal errors, Elysia BESS Copilot combines advanced cloud algorithms with real-time on-premises controls to create an integrated solution that doesn’t just alert operators to issues in the system but proactively helps correct them. 

With Elysia BESS Copilot, owners and operators can recover full availability with performance diagnostics that continuously monitor, diagnose and prioritise fixes for the issues causing unexplained shortfalls; improve O&M efficacy by automating preventative maintenance and service actions; capture more revenue by correcting state of charge (SoC), state of energy (SoE) and telemetry in real time so inaccurate signals no longer distort planning and dispatch; and dispatch power reliably by optimising power allocation across power conversion systems (PCS) to eliminate the unexpected derating and inverter shutdowns that cut full-power hours 

Elysia BESS Copilot is the result of Elysia’s acquisition of Zitara, a pioneer in on-premises precision controls technology for utility-scale batteries. With a combined force of 125+ battery engineers and experts, Elysia says it is now the leading battery intelligence group, with a mission to support decarbonisation through better battery performance on the grid, on the road and in heavy industry.  

As part of Fortescue, a global leader in mining decarbonisation with US$30 billion in assets worldwide, Elysia adds that it brings unmatched resources to solving the asset performance issues that afflict the battery energy storage industry.  Elysia Executive Vice President, Battery Energy Storage, Shyam Srinivasan said: “The BESS industry doesn’t just have a visibility problem, it has an action problem. Asset managers struggle to understand why their batteries are underperforming and quantify the impact.”

He adds: “Even when the root cause is clear, taking corrective action and pinpointing RMA evidence can be difficult. By integrating battery intelligence with cloud APM systems and real-time controls on-premises, we’re helping them move from insight to site.” 

Elysia BESS Copilot is designed to fulfil the needs of asset management teams globally, including at over 2 GWh of customer sites across US, UK and Australia in addition to its ongoing rollout across 5 GWh of BESS helping to power Fortescue’s own Pilbara Green Grid operations.  

The post Elysia BESS Copilot – managing more mine GWh with less effort appeared first on International Mining.