Tertiary Minerals starts 1,000-metre drilling phase in Zambia

British explorer Tertiary Minerals began a fifth exploration phase at its Mushima North project in Zambia on November 8, aiming to test whether silver-copper-zinc mineralisation continues at depth and could support a maiden mineral-resource estimate.

The company plans approximately 1,000 metres of diamond drilling across four holes. The holes will test areas below those investigated by earlier shallow reverse-circulation drilling. Diamond core is expected to provide geologists with better structural and geological information.

Earlier drilling results

Tertiary Minerals’ earlier reverse-circulation programme comprised 39 holes totalling 3,639 metres. The company reported a 70-metre downhole interval grading 31 grams per tonne of silver, 0.29% copper and 0.25% zinc.

A separate reported interval measured 68 metres and graded 27 grams per tonne of silver, 0.15% copper and 0.52% zinc. These are downhole lengths and do not automatically represent the true thickness of the mineralised zones.

Mushima North lies in Zambia’s copper-rich geological terrain and contains silver, copper and zinc mineralisation. Its proximity to established mining districts may support exploration logistics, but regional mining activity does not guarantee a commercial deposit at the project.

Resource and processing work

Tertiary Minerals has been working to convert an exploration target into a formal resource through infill drilling, extensions to the mineralised footprint and a better understanding of grade continuity. Reported exploration-target tonnages and grades are conceptual estimates, not measured, indicated or inferred resources.

A resource estimate would need to meet the required technical standards. The new drilling is also intended to help define possible processing requirements for the multi-metal mineralisation.

A combined silver-copper-zinc operation could require different flotation and concentrate-handling arrangements from a straightforward copper mine. Recoveries, impurities and metal-payability terms could affect future economics.

No development budget, commercial processing route or mine-construction decision has been announced. The next substantive milestones are deeper assays, a defensible geological model and a first compliant mineral-resource estimate.

The post Tertiary Minerals starts 1,000-metre drilling phase in Zambia appeared first on Europe Mining News.

SOURCE
Europe Mining News


Read original article →