Sitka Gold Drills 41.7 Metres of 2.20 g/t Gold from Surface, Including 1.2 Metres of 53.10 g/t Gold, Within 74.8 Metres of 1.31 g/t Gold, Confirming High-Grade Mineralization at the Contact Zone, RC Gold Project, Yukon
Sitka Gold Drills 41.7 Metres of 2.20 g/t Gold from Surface, Including 1.2 Metres of 53.10 g/t Gold, Within 74.8 Metres of 1.31 g/t Gold, Confirming High-Grade Mineralization at the Contact Zone, RC Gold Project, Yukon
Drilling confirms and expands significant gold mineralization at the Contact and Bear Paw targets Drill Hole DDRCCC-26-162 intersected 74.8 m of 1.31 g/t gold from surface, including 41.7 m of 2.20 …