Rockfire reports 13.6% zinc grade after sorting tests in Greece

Rockfire Resources reported preliminary TOMRA Mining X-ray transmission sorting results at its Molaoi polymetallic project in Greece on 13 November 2026. The first sorting stage raised zinc grade in a representative tested feed from 5.85% to 13.6%, a reported 132.5% uplift. The results suggest waste could be rejected before grinding and flotation, potentially reducing material-handling requirements and improving processing economics.

Sorting results and test scale

Further sorting stages produced selected material grading 11.7% and 9.9% zinc. Approximately 97.7% of the zinc contained in the tested sample was retained in selected material across the reported sorting sequence. This measures zinc retained during sorting, not final plant metallurgical recovery or saleable zinc output.

The programme covered 48 quarter-core samples with a combined mass of 65 kilograms. Tests used material in the 8–25 millimetre size range. The limited sample scale does not prove a full commercial plant could achieve the same grades, throughput or recovery rates.

Further project work

Molaoi is being evaluated for zinc, lead, silver and germanium potential. Rockfire is pursuing a separate initial JORC-compliant estimate for germanium; germanium should not be considered an established economic resource before the estimate is published.

Larger representative samples, integrated metallurgical tests and feasibility work are required to establish whether ore sorting offers a bankable advantage.

The post Rockfire reports 13.6% zinc grade after sorting tests in Greece appeared first on Europe Mining News.

SOURCE
Europe Mining News


Read original article →