HomeMining NewsMinenportalCollective Mining Drills 154.30 m @ 12.66 g/t AuEq*, Including 30.45 m @ 39.01 g/t AuEq*, at Apollo’s Ramp Zone Collective Mining Drills 154.30 m @ 12.66 g/t AuEq*, Including 30.45 m @ 39.01 g/t AuEq*, at Apollo’s Ramp Zone admin1 hour ago2 Views APC174-D4 intersected 154.30 m @ 12.66 g/t AuEq from 1,208 m below surface, including 30.45 m @ 39.01 g/t AuEq from 1,339 m below surface. It is the broadest high-grade intercept drilled to date at … Previous PostAzimut Undertakes New Mineral Resource Estimate on the Patwon Gold Deposit, James Bay Region, QuébecNext PostU.S. GoldMining Appoints John DeLucchi to Its Board of Directors to Support Strategic Growth and Advancement of the Whistler Gold-Copper Project, Alaska Related Posts Azimut Undertakes New Mineral Resource Estimate on the Patwon Gold Deposit, James Bay Region, Québec admin1 hour ago PPX Intercepts High-Grade Gold, Silver, and Copper at Callanquitas, with 13.28 g/t Au, 5,204 g/t Ag and 5.4% Cu Over 1.0 m; and Completes the First Drill Hole at Portachuelos admin7 days ago PRU September 2026 Quarter Report admin1 week ago
Azimut Undertakes New Mineral Resource Estimate on the Patwon Gold Deposit, James Bay Region, Québec admin1 hour ago
PPX Intercepts High-Grade Gold, Silver, and Copper at Callanquitas, with 13.28 g/t Au, 5,204 g/t Ag and 5.4% Cu Over 1.0 m; and Completes the First Drill Hole at Portachuelos admin7 days ago